Product details Product Inquiry

Medusa head beading, sequin and chenille embroidery combination – Image 1

Medusa head beading, sequin and chenille embroidery combination – Image 2

Medusa head beading, sequin and chenille embroidery combination – Image 3

Medusa head beading, sequin and chenille embroidery combination – Image 4

Computerised bead-embroidery machine stitching (loose-bead chain machine embroidery) uses high-precision electronic control and dedicated bead-feed guide rails to lay red, white and metallic high-refractive-index glass seed beads in dense arrangement, combined with sapphire-blue raised-loop chenille embroidery and gold-and-red micro-layered sequins. The cool, hard lustre of the beads and the plush pile loops are formed in a single pass on the same machine, delivering the three-dimensional visual and tactile layering of heavy-duty beadwork.

Optional techniques

Glass seed beads (1.5–3.0mm), metallic tube beads and custom-shaped beads are available; these can be combined with chenille embroidery, sequin embroidery, flat embroidery and 3D cord embroidery in a single multi-process machine embroidery run. Base fabrics include high-density knit, sweatshirt fleece, wool, silk, denim and leather to order.

Applications

Front chest panels of heavy-duty streetwear sweatshirts, focal back graphics on couture jackets, designer runway pieces, chest appliqués for light-luxury evening gowns, and premium decorative components for bags and footwear.

Customisation process

MOQ from 300 pieces; three simple designs are sampled free of charge (a sampling fee applies to complex designs and is credited against orders reaching MOQ). Standard sampling lead time is 24–48 hours (3–4 working days for complex multi-process combinations), and bulk production is delivered within 5–10 working days. Customers in the Pearl River Delta region can arrange on-site meetings and physical sample review.

Production capacity

Dobest operates more than 30 specialised computerised embroidery machines, supporting integrated braiding-and-forming of beading, sequins and chenille embroidery in one pass. Bead placement is precise and stitching is firm and resistant to friction and pulling, helping beads stay in place through washing and care, with rapid sampling in 24–48 hours.

Custom Specifications & Production Parameters
SpecificationDobest manufacturing standard
Craft & aliases Beaded embroidery (computerized bead stringing / bugle bead / seed bead)(Read the full craft guide)
Core specifications Handles 2.0–4.0 mm glass seed beads, acrylic beads and metal bugle beads; needle concentricity tolerance ≤ ±0.05 mm
Size & stitch calculationQuoted from your artwork (AI / PDF / CDR / high-resolution image) or a physical sample at full stitch density; available as direct panel stitching or stand-alone patches (hot-melt adhesive / hook-and-loop / sew-on edge)
Fabrics & applications Evening gowns, couture womenswear, fashion bags, footwear decoration, fine brooches
Locking & wash resistance CNC bead-by-bead placement + individual micro-knots on the reverse; a single damaged bead will not unravel the strand
Materials & audit credentialsCoats, Sakura and recycled eco yarns (raw materials supplied with OEKO-TEX® and SGS test reports from our suppliers); factory audited under Disney ILS and adidas SEA, with an internal defect rate below 1%
MOQ, lead time & capacityMOQ 300 pcs; 3 free simple samples (24–48 h for standard, 3–4 working days for complex constructions); bulk lead time 5–10 working days; regular annual capacity 1.5 million pcs (up to 20,000 pcs/day at peak with full day-and-night shifts, subject to evaluation)
Product FAQ · Quality & Craftsmanship
Q1:Can I customize this embroidery for my brand?+
Yes, 100% bespoke OEM/ODM manufacturing. Provide your vector artwork (AI, PDF, DST), and our punchers will deliver physical samples for approval.
Q2:What is the MOQ and production capacity?+
MOQ is 300 pieces. Equipped with 30+ specialised machines, our annual capacity reaches 1.5 million pieces.
Q3:What is the sampling turnaround and bulk lead time?+
Sampling takes 24–48 hours; bulk production 5–10 working days. Rush orders can be prioritized on dedicated lines.

Product Inquiry

Product Inquiry

  • Your name:

  • Email:

  • Company:

  • Phone:

  • Address:

  • Message:

  • Attachment:

    JPG / JPEG / PNG / GIF / PDF / AI / PSD / CDR / EPS / HEIC / ZIP, up to 15MB per file (optional)